25 October 2008

Garmin Mobile XT latest version


Changes made from version 5.00.00 to 5.00.10:
Provide support for Samsung INNOV8 (i8510).
Change default vehicle icon to blue car.
Correct an application shutdown when frequently recalculating a route.
Correct the displayed speed limit value for some specific roads.
Correct the blank green screen displayed when switching to the map page.
Improve the layout of the Local Search capability.
Improve the layout of the map page for the Nokia E90 screen size.
How to install
1. Extract Garmin Mobile XT for Symbian S60 3rd Edition software version 5.00.10 P&P.rar
2. Paste Garmin Folder & GarminMobileXT.sis to storage card
3. Install GarminMobileXT.sis

ATV and FM Transmitter Project Schedule

TV3 Bukit Bakar, Machang, Kelantan

Installation and T&C - 21.11 – 07.12
InstallationArrival of Tx Installation Team 0 d Mon 24/11/08 Mon 24/11/08
Installation of new Rx Antenna 1 d Tue 25/11/08 Tue 25/11/08
Installation of new Transmitter System 4 d Tue 25/11/08 Fri 28/11/08
T&C and TrainingFlight time and arrival of Commissioning Engineer at Kota Baru Thu 11/12/08 Fri 12/12/08
Test, Commissioning and Tx. Acceptance - 2days Sat 13/12/08 Sun 14/12/08
"24 hours ""Black Heating Test" 1 d Mon 15/12/08 Mon 15/12/08
Site training 2 days - Tue 16/12/08 Wed 17/12/08
Departure of Commissioning Engineer from Kota Baru Wed 17/12/08 Wed 17/12/08



Site 1 : Celcom Tower, Bukit Cincin - Genting Higland

Site Visit: 28.10.2008 - Done
Installation Date:
Testing and commissioning 3 d 20.01 - 22.01
Site Training 2d 23.01 - 24.01
Move to Site 2

Site 2 : Bukit Kledang (North of KL, near Ipoh)

Site Visit: 29.10.2008- Done
Installation Date:
Testing and commissioning 3 d 26.01 - 28.01
Site Training 2 d 29.01 - 30.01
Move to Site 3

Site 3 : Gunung Jerai (North from KL, near Gurun, Kedah)

Site Visit: 30.10.2008 - Done
Installation Date:
Testing and commissioning 3 d 01.02 - 03.02
Site Training 2 d 04.02 - 05.02
Move to Site 4

Site 4 : Gunung Ledang (South of KL, near Melaka)


Site Visit: 31.10.2008 - Done
Testing and commissioning 3 d 01.02 - 03.02
Site Training 2 d 04.02 - 05.02

End.........

NTV7 and TV3 Sevice Circular


Gunung Pulai (13 PAs)

  • 31.10 - 03.11 ( 4 days) - Done


Gunung Jerai (16 PAs) - Done

  • 05.11 - 09.11 ( 5 days)


Flight to Kuching, Gunung Serapi 12.11 - maleh nak pi

  • Serapi (7 PAs) 13.11 - 15.11 (3 days)

Flight to Sibu, Sarawak 16.11 - segan nak pi nak prepare hat Machang

  • Lima (8 PAs) 17.11 - 19.11 ( 3 days)
    Flight back to KL 20.11

14 October 2008

Germany Trip - 14/10/2008





5+1 Transmitter

FAT of VHF Transmitter at Teisnach, Germany

Transit at Dubai, United Arab Emirates - Thango2